Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task # : 01 a State :Colorado Pertnitlob # : M-2002-046 <br />Date: 01!30/1003 County:Mesa Abbreviatioh:none <br />User: GRM Site :D Road Gravel Pit Filename :M046-01a <br />Permit or other job action :final reclamation costs estimate <br />Task description :place overburden from "F" to "A" <br />Model :Cat 633E Sedes 2 Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cost/hour : $72.62 NA Weight (UST) : 58.34 <br />Operating cosf/hour : $110.00 100 Cost data source : (CRGJ <br />Operator cosUhour: $30.84 NA <br />Total unit cosf/hour : $213.46 Total fleet cosf/hour : $426.92 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 93,350 LCY factor: NA volume : 93,350 LCY <br />Source of quantity takeoff :accepted verified volume from application <br />Source of estimated swell factor :NA <br />Hauling CaoaciN <br />Basis <br />Material weight: 2,900 pounds/LCY <br />Material description <br />Decomposed rock-50% Rock, 50% Earth <br />Rated payload : 82,000 pounds <br />Payloatlnapacity: 28.28 LCY <br />Cycle Time (load + haul + soread + return! <br />Travel time <br />Scraper Bowl (volume) Basis <br />Struck volume : 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.28 LCY `"' <br />Loading time : 0.90 minutes' <br />Maneuver and spreading time : 0.70 minutes <br />' loading drtre per pair on push-pull models <br />Route ~ Distance (feet) + Grade (%} I Roll, res.(°/aj I Tofal res.(%} ~ VelacIty (fpm) ~ Travei time (min.) <br />Haul: 500 16.5 5.0 21.5 258 1.94 minutes'" <br />Return: 500 -f6.5 5.0 -11.5 f,257 0.53 minutes'" <br />"(revel lime etljuated for acceleretion ant deoelerelion at load ark dump points <br />- vebdtiea are mac adainaG!e per fatal reaistanoe ahoen, rwt average <br />Job Condition Correction Factors <br />Site altitude (feet) : 4,600 <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor: 0.83 (1 shift/day) <br />Net job correction factor : 0.83 <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) <br />Unit cost : $0.617 /LCY <br />Total cycle time : 4.07 minutes <br />Adjusted Hounv ProduuYron <br />Unadjusted unit producion : 416.65 LCY/Hour"' <br />Adjusted unit production : 395.82 LCY/Hour <br />Adjusted fleet production : 691.64 LCY/Hour <br />'^Y times rolume on Dush-puU motlals <br />Total job time : 134.97 Hours <br />Total job cost : $57, 621 <br />