Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPPR.ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :DMG <br />Task # : 03C State :Colorado <br />Date: 01/30/2003 County:Mesa <br />User: GRM Site : D Road Gravel Pi[ <br />Permit or other job action :final reclamation costs estimate <br />Penniujob # : M-2002-046 <br />Abbreviation :none <br />Filename :M046-03c <br />task description :replace topsoil in Area "C" <br />Model :Cat 633E Series 2 Shift basis : 1 pertlay <br /> <br />Cost Breakdown : Job utilization °h Horsepower : 490 <br />Ownership cosuhour : $72.62 NA Weight (UST) : 56.34 <br />Operating cosuhour : $110.00 100 Cost data source : (CRG) <br />Operator wsuhour : $30.84 .NA <br />Total unit cosuhour : $2>3.46 Total Fleet cosuhour : $426.92 <br />MATERIAL QUANTITIES <br />Initial Swell loose <br />volume : 2,656 LCY factor : NA volume : 2,656 LCY <br />Source of quantity take-off :accepted verified volume from application <br />Source of estimated swell factor :NA <br />Haulinc Capacity <br />Material description <br />Top Soil <br />Basis <br />Rated paybad : 82,000 pounds <br />Payload capacity : 51.25 LCY <br />Cvcle Time (load + haul + spread + retu <br />7revel time <br />Route ~ Distance (feet) Grade-(%) Roll. res.(%) <br />Haul: 600 0.0 5.0 <br />Retum : 600 0.0 5.0 <br />travel time etljuated for easleralion end deceleration al load and dump points <br />veloatiea era max. ettelnabb perrotal resistance siwwn, not everege <br />Job Condition Correction Factors <br />Site altitude (feet) : 4,600 <br />Altitude adjustment factor : 1.00 (Caf HB) <br />Job efficiency factor: 0.83 ~(fshlff/day) <br />Net iob wrtection factor : 0.83 <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) <br />Unit cost : $0.344 /LCY <br />Bowl (volume) Basis <br />Stmck volume : 23.20 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 28.60 LCY <br />Adjusted capacity : 28.60 LCY "` <br />Loading time : 0.90 minutes' <br />Maneuver antl spreading time : 0.70 minutes <br />' loading dme per pair on push-pull models <br />Total res.(°h) Velocity (fpm) Travel time (min.) <br />5.0 1,375 0.44 minutes" <br />5.0 2.288 r 0.26 minutes" <br />Total cycle time 2.30 minutes <br />Adjusted Houdv Production : - <br />Unadjusted unit production : 746.54 LCY/Hour"' <br />Adjusted unit production : 619.63 LCY/Hour <br />Adjusted Fleet production : 1,239.26 LCY/Hour <br />times volume on push pull models <br />Total job time <br />Total jdb cost <br />2.14 Hours <br />$915 <br />