Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCI]APFI] _ AAII Y WARK <br />'ROJEGT IDENTIFICATION ' <br />Agency or organization name : DMG <br />Task # : 016- State :Colorado Pennitlob # :M•2002-046 <br />Date : 01/30/2003 County :Mesa Abbreviation :none <br />User : GRM Sita :D Road Gravel Pit Filename : M048-016 <br />Permit or other job action :final reclamation costs estimate <br />Task description :rep/ace overburden in Area "B" to establish 3H:1 V Slope <br />HOURLY EQUIPMENT COST <br />Model :Cat 633E Series 2 Shin basis : 1 per day <br /> <br />Cost Breakdown : Job utilization % Horsepower : 490 <br />Ownership cost/hour : $72.62 NA Weight (UST) : 56.34 <br />Operating cest/hour : $110.00 ~ 100 Cost data source : (CRC) <br />Operator cest/hour: $30.84 NA <br />Total unit wst/hour : $213.46 Totaf Fleet cesUhour : $428.92 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,555 LCY factor: NA volume: 10,555 LCY <br />Source of quantity take-oR :accepted verified volume from application <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Haulinc Caoaci <br />Scraper Payoad (weight) Basis : Scraper Bow! (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume: 23.20 LCY <br />Matedal description : Heaped volume : 34.00 LCY <br />Decomposed rock - 50% Rock, 50% Earth Average volume : 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 28.28 LCY Adjusted capacity : 28.28 LCY "` <br />Cvcfa Time !load + haul + spread + return) : Loading time : 0.90 minutes ' <br /> Maneuver and spreading time : 0.70 minutes <br />Travel time : ~ toadup uma pa, parr on puanyml modals <br />Route, Distance (feet) Grade (°A) Roll. res.(%) ~ Total res.(%) ~ Velocity (tpm) ~ Travel time (min,) <br />Haul: 500 16.5 5.0 21.5 258 1.94 minutes" <br />Return : 500 -18.5 5.0 -11.5 1,257 0.53 minutes <br />"travel Ilme atljuatetl for acceleration entl tlecaleretian at loetl and dump points <br />vaiocitiea me a,°. anemama peno<al resi stance enovm, n ot evara6e Total cycle time 4.07 minutes <br />Job Condition Correction Factors <br />Site altitude (feet) : 4,800 Adjusted Hourlv Production <br />Altitude adjustment factor : 1.00 (Cat HB) Unadjusted unit production : 416.65 LCY/Hour"' <br />Job efficiency factor : 0.83 (1 shift/day) Adjusted unit production : 345.82 LCYIHour <br /> Adjusted fleet production : 891.84 LCY/Hour <br />Net job CoffeCflOn faCtOr : 0.83 "' ~ times volume on pushpull models <br />JOB TIME AND COST <br />Fleet size : 2 Scraper(s) Total job time : 15.26 Hours <br />UnRcest: $O.sn /LCY Totaljobcost: $6,515 <br />