Laserfiche WebLink
Copies of all drill hole logs, core logs, geophysical logs, and coal analyses acquired as <br />part of this exploration program will be submitted to the Bureau of Land Management as <br />required. <br />Map of Exploration Area: <br />A location map showing the proposed exploration area, access roads and drill sites is attached <br />(Figure 1). A map showing all surface owners of record is attached (Figure 2). <br />Reclamation Bond <br />Ark Land has provided an estimate of the reclamation bond in Table V. <br />Table V <br />Estimated Reclamation Bond Amount <br />PLUGGING <br />HOLES; <br />Unit I <br />Hole Hole Factor Cost/Unit Cost Cost Center <br /> EQUIPMENT (mobilization and <br />1 day/hole 16 $1,680.00 $26,880.00 use) <br />16 man-hrs. 16 $15.50 $3,968.00 LABOR <br />About <br />150 ft/hole 16 $27.00 $432.00 CEMENT <br />955 (avg.) ft. 16 $0.40 $6,112.00 BENTONITE <br /> Subtotal: $37,392.00 <br />SURFACE RECLAMATION: <br />12.9 (Tot. Miles) $5,000.00 $64,500.00 TEMPORARY ROADS <br />11.35 (Tot. Miles) $330.00 $3,745.50 PERMANENT ROADS <br />0.17 ac/hole 16 $564.00 $1,534.08 DRILL PADS <br /> Subtotal: $69,779.58 <br /> SUBTOTAL: $107,171.58 <br /> Contingency 20% $21,434.32 <br /> TOTAL $128,605.90 <br />Recommended <br />Bond Amount: $129,000.00 <br />15 <br />