Methods and Equipment for Drilling <br />Rotary drilling and coring on each site will be completed using arubber-tired truck- <br />mounted drilling rig. To aid in the protection of the hydrologic balance and protect other <br />resources the company will utilize as small a drill rig as can safely and successfully complete the <br />job. In doing so, the requirements for access road and drill site disturbances aze lessened. <br />Support equipment may consist of one or two water trucks, one rig-up truck, a pipe truck, flatbed <br />trailer, one or more air compressors, and/or boosters, a supply trailer and three 4 x 4 pickups for <br />the drill crews and company representatives. This assembly is generally referred to as a "drilling <br />unit". Two drilling units are anticipated during the drilling project. <br />Water for drilling operations will either be purchased and trucked to the sites from <br />outside the project area or leased and obtained from the Big Salt Wash drainage. Pumping the <br />water used in the drilling process, if possible, wilt minimize water truck traffic on the temporary <br />access roads thereby minimizing surface disturbance. The use of these other potential water <br />sources will be approved by the agency or parry owning the water rights prior to their use. hi the <br />event stock ponds are utilized, minimum water levels will be established to ensure sufficient <br />water is left for stock and wildlife. <br />Upon hole completion, one truck mounted geophysical logging unit will be used at each <br />hole location. If requested, Ark Land Company will retain in its files all drill and geophysical <br />logs and all un-analyzed drill cores for at least 1 yeaz, and will make them available for <br />inspection by an authorized officer. <br />Estimated Size and Denth of Holes <br />Drilling conditions aze variable in the exploration area. The initial diazneter of each drill <br />' hole will be 9 7/8 inches to allow for the placement of up to 100 feet of surface casing. This <br />casing is centered and cemented in-place from the top of the hole. Unless continuously cored <br />from the surface, a smaller (6 1 /8") diameter rotary hole will be drilled to core point (50 ft. above <br />' the uppermost mineable seam). This 6 1/8" rotary hole will be cased if necessary to maintain <br />hole integrity. The primary drilling medium will be compressed air with mist/foam injection to <br />' aid in the circulation of cuttings to the surface. If air and foam prove to be an insufficient <br />medium, or if lost circulation becomes a problem, drilling mud and lost circulation materials will <br />be used. <br />' The core retrieved from the hole will be approximately 3 inches in diameter although <br />smaller diameter core (1 7/8") may be used in some instances. The outer diameter of the cored <br />~ portion of the hole will be 5 inches or less. <br />Table III depicts the estimated depths for each of the six proposed holes in the exploration <br />area. <br />11 <br />