Laserfiche WebLink
C~ <br />File M-77-519 <br />Page 2 <br /> <br />the 4.5 acres to be reclaimed are as follows: <br />Ripping/scarifying 3.5 ac @ 1/ac/hr @ $50 $ 175.00 <br />Grading 1614 yds, 1 ac, $ .80/yd 1,291.20 <br />Topsoiling 807 yds/ac, 4.5 ac @ $ .65/yd 2,360.50 <br />Seed @ $125/ac ) <br />Fertilizer @ $50/ac) $300/ac 1,350.00 <br />Mulch @ $125/ac ) <br />Sub-total, Moderate Disturbance $ 5,176.70 <br />MINOR DISTURBANCE includes 2.0 acres to be reclaimed: <br />2.0 acres @ $ 300/ac $ 600.00 <br />TOTAL estimated reclamation costs $ 9,081.15 <br />There are approximately 2.4 acres encompassed in a gravel bar <br />which is exposed except during periods of high runoff. It is not <br />anticipated that this area will be topsoiled or revegetated. There <br />is approximately 2.9 acres of existing pond area within Phase I which <br />will remain, <br />