Laserfiche WebLink
• Productivity <br />Truck Cycle Time - 19.82 minutes <br />- 2.77 cycles/hr <br />- 55.40 cu-yd/hr <br />(70cu-yd)/(55.40cu-yd/hr) = 1.26 hour <br />Cost: Loading and Hauling <br />Loader ($85.91/hr)X(1.26 hr) _ $108.25 <br />Truck ($58.07/hr)X(1.26 hr) _ $ 73.17 <br />SUBTOTAL = $181.42 <br />Cost: Disposal at Local Landfill <br />(70cu-yd)/($2.00/cu-yd) _ $140.00 <br />Cost: Breaking Foundations <br />Assume Productivity - 85 cu-yd/hr (980C Loader) <br />• (70cu-yd)/(85cu-yd/hr) = 0.82 hour <br />(0.82hr)X($85.91/hr) _ $ 70.75 <br />TOTAL $392.17 <br />FINAL GRADING <br />• Use D7 for Rough Grading <br />• Use 126 Grader for Fine Grading <br />• 6.3 Acres (area) <br />Assume 2 Days to Complete Regarding <br />Cost ~ 4 <br />D7 - (16hrs)X($68.73/hr) _ $1,100.00 <br />126 - (16hrs)X($52.40/hr) _ $ 838.40 <br />6b TOTAL °,.'1,938.40 <br />• <br />-3- <br />