Laserfiche WebLink
• <br />Mt. Harris Coal Company <br />RECLP.MATION BOND <br />INTRODUCTION <br />The following reclamation activity will be conducted at the end of <br />operations at Mt. Harris Coal Company: <br />• Salvage and/or Removal of Structures and Facilities <br />• Clean Up and Removal of all Miscellaneous Debris, Materials, <br />and Equipment <br />• Removal of Footings and Foundations <br />• Final Grading of Site <br />• Covering of Coal hlaterial With a Minimum of Two (2) Inches of <br />Gravel <br />SALVAGE AND/OR REMOVAL OF STRUCTURES AND FACILITIES <br />• The following facilities and structures will be salvaged and/or <br />removed from the coal loadout site: <br />Sold for salvage at no cost to Mt. Harris Coal Company: <br />• Grizzly <br />• Primary and Secondary Crusher <br />• Sizing Screens <br />• Conveyors and Support Structures <br />• Weigh Station <br />• Office Trailer and Well House <br />CLEAN UP AND REMOVAL OF ALL MISCELLANEOUS DEBRIS, MATERIALS AND <br />EQUIPMENT INCLUDING POWER POLES <br />Use: 50 cu-yd Material on Site <br />• 980 C Cat Loader <br />20 cu-yd Highway Truck <br />Load and Haul to Local Landfill <br />-1- <br />