Laserfiche WebLink
• <br />FIGURE 2.1 - GEOTECHNICAL INVESTIGATION <br />FIGURE 4.1 -HYDROLOGIC ANALYSES <br />FIGURE 4.2 -SEDIMENT POND HEIGHT-VOLUME CURVE <br />FIGURE 4.3 -WASTE BANK STATIC STABILITY RESULTS <br />FIGURE 4.4 -WASTE BANK PSEUDOSTATIC STABILITY RESULTS <br />FIGURE 4.5 -SEDIMENT POND EMBANKMENT STATIC STABILITY RESULTS <br />FIGURE 4.6 -SEDIMENT POND EMBANKMENT PSEUDOSTATIC STABILITY RESULTS <br />FIGURES <br />APPENDICES <br />• <br />r1 <br />LJ <br />APPENDIX A - GEOTECHNICAL INVESTIGATION <br />APPENDIX B -HYDROLOGY/SEDIMENTOLOGY OUTPUT <br />APPENDIX C -CALCULATION WORKSHEETS <br />APPENDIX D -SLOPE STABILITY OUTPUT <br />APPENDIX E -DESIGN DRAWINGS <br />96266/1424.RPT Coal Mine Weste Bank Final Design for the Bowie No. 2 Mine <br />June 1998 WESTEC <br />ADLQUACT-al <br />ii <br />