Laserfiche WebLink
Dennis McGrane, resume <br />page 2 <br />Forecasting well yields for Front Range water districts, corporations, and golf courses; <br />recommended well and pump replacement schedules; and designed and supervised installation of <br />wells, pumps, motors, and controls for I hp to 175 hp (460 - 2,300 volt) systems. <br />Evaluating the feasibility of artificial recharge projects in Colomdo and Arizona. <br />Appraisal of decreed ground water rights for numerous Front Range entities. <br />Layne-Western Inc., Aurora Colorado <br />2001-September, 2004 -Project Manager <br />Responsible for all aspects of Contractor project management including: well and pumping <br />system design; well testing and interpretation; aquifer evaluation and development; well <br />rehabilitation design and implementation; and construction management. Significant projects <br />include: <br />Design-build of the Saratoga National Fish Hatchery Upgrades that included replacing wells, <br />pumping systems, pipelines, controls; and reprogramming the SCADA system. <br />Design-build of the ASLAN Water Districts deep well pumping, control and SCADA system, and <br />discharge piping and metering vaults. <br />Design-build of the Tagawa Gardens and City of Fountain alluvial wells and pumping systems <br />Bechtel Civil Inc., San Francisco, CA. <br />1985-] 988 -Geologist <br />Field experience included characterization of hazardous waste sites in New York, New Jersey, <br />and Missouri. Contaminants were typically radionuclides and heavy metals. Responsible for: <br />borehole drilling; monitoring well installation; soil and water sampling; permeability testing; <br />designing and implementing engineering testing programs; and writing geological reports. <br />Supervised all subcontractor activities. <br />PUBLICATIONS <br />Determinine Stream Depletions in Colorado Usine MODFLOW, MODFLOW `98 Conference, <br />Golden, Colorado, October 1998. <br />Evaluation of the Paeosa Sarinas Geothermal Reservoir and Implications of Potential Additional <br />Reservoir Development, ASCE Water Resources and Management Conference. Denver, <br />CO, 1994 (w/Jon Ford). <br />Gila River Recharge Proiect as an Alternative to Buttes Dam, CONSERV90 National Conference <br />and Exposition. Phoenix, AZ, 1990. <br />Comolementine Radiologic Data with Geoloev: A Case History, Second Annual International <br />Conference on Case Histories in Geotechnical Engineering. St. Louis, MO, 1988. <br />PRESENTATIONS <br />Ara ahoe Aquifer Water Levels 1958-1996, South Platte Forum, Longmont, CO, 1997. <br />Monitoring the Reliability of Your Ground Water Sup-plv, SDA Conference, Aspen, CO, <br />1999. <br />PROFESSIONAL ACTIVITIES <br />Colorado Ground Water Association <br />American Society for Civil Engineers <br />Member ASCE Committee on Guidelines for Artificial Recharge of Ground Water <br />LEONARD RICE ENGINEERS. INC. <br />2000 CLAY SraeeY. Swre 300, DErvvER, COLORADO 8021 1-51 1 9 • PHOrve (303) 455-9589 • Fnx (303) 455-01 15 <br />