Laserfiche WebLink
Jon R. Ford, resume <br />page 2 <br />Gardens, and South Suburban Parks and Recreation. <br />• Design and construction observation, Little Nell Well and Tourtellotte Spring <br />Collection System, Aspen, Colorado; Sopris Village Well, EI Jebel Colorado, Well <br />R2 and West Vail 7, Vail, Colorado; Wells 26 and 31, Beebe Draw Wells A & B, <br />City of Brighton. <br />• Analysis of Ground Water available for Appropriation, Lakewood, Colorado <br />(includes expert witness testimony and litigation negotiation with objectors). <br />• Well yield forecast and well field development plan including present value economic <br />analyses for Rangeview Water and Sanitation District, City of Lakewood, City of <br />Arvada, and Donala Water and Sanitation District. <br />• Hydrogeologic analysis and delineation of fracture system to select well sites, and <br />design and construction observation of two wells at Buttermilk Ski Area, Aspen, CO. <br />• Evaluation of the Hydrogeologic setting and ground water mass balance, Big Chino <br />Valley, San Pedro River and Verde River Basins, Arizona. <br />• Evaluation and appraisal of value of ground water available for export to Phoenix <br />metropolitan area from two ranches in northwestern Arizona.. <br />• Evaluation of hydrogeologic setting of the Pagosa Springs geothermal reservoir, <br />Pagosa Springs, Colorado. <br />• Expert testimony in the Gila River Adjudication in Arizona regarding the delineation <br />of appropriable ground water. <br />Responsible for well pump and pump station design. Significant projects include; <br />• South Suburban and Lone Tree Golf Course well pump installation (Denver Basin). <br />• Donala Water and Sanitation District, Towne Center Metropolitan District and <br />Heather Gardens (Denver Basin). <br />• City of Black Hawk North Clear Creek Pump Station and Infiltration Gallery. <br />• City of Black Hawk Four Mile Gulch Pump Station. <br />• Upgrade of Vail Well R2 and Well R6 Pump Station. <br />• Transient pressure analysis of Eagle Pines Pump Station, Aspen, Colorado. <br />• Transient Pressure analysis, Little Nell Well, Aspen, Colorado. <br />• Design and transient pressure analysis, Hidden Valley Booster Pump Stations (3), <br />Black Hawk, Colorado. <br />1985-1986 -Consulting Geological Engineer <br />Conducted detailed geological evaluation of a 198 well, oil field in preparation of field <br />extension drilling program. Drilled two successful wells that proved 8-10 additional drill <br />sites. Conducted geologic and engineering evaluation of 120 gas well purchase. Work <br />included reserve forecasts, economic analyses and analysis of undrilled acreage. <br />Resource Technology Corporation, Denver, Colorado. <br />1981-1985 -President and Senior Geologist <br />Developed a petroleum exploration model that delineated areas of greatest potential in the <br />Niobrara Formation of the Denver Basin. Model integrated geologic elements of well log <br />analysis, core examination and satellite image analysis with engineering data that included <br />production forecasts and well completion practices. <br />1978-1981 -Vice President and Senior Geologist <br />Conducted three-year-long evaluation of coal resources in Colorado, Wyoming, Utah, New <br />Mexico, South Dakota and Montana for the U.S. Geological Survey. Project included <br />~ ~) LEONARD RICE ENGINEERS INC. <br />\~/ 2000 CV1Y STREET. SUITE 300. DENVER, COLORADO 8021 1-51 1 9 • PHONE (303) 455-9589 • FAx (303) 45501 1 5 <br />