Laserfiche WebLink
,- <br /> <br />a • <br />Exhibit L <br />Reclamation Costs <br />STROPJG FARP1 ~2 <br />There will be approximately 12,000 feet of shoreline when the area is <br />completely mined. The cost of sloping the banks to 3:1 or- flatter ~.vould <br />be distributed over the entire life of the mining operation, being shaped <br />as the mined area advanced, so this particular operation will not have a <br />cost figured in, as that would be done by the planned withdrawal of gravel. <br />Total bank area to be shaped and seeded will be approximately 7 acres, <br />and will require spine 3,500 Cubic yards of topsoil, at an estimated total <br />cost of 53500 for machine use. <br />Cost of seeding from the attached list shown in Exhibit J is estimated <br />to be about 530 per acre, or about 5210. <br />Costs of trees and shrubs, if used, will vary according to local com- <br />mercial nursery prices. <br />:. `--,,~ <br />~, <br />gyn.: ra~q. <br />P' s <br />L.: ,.) _ <br /> <br />