Laserfiche WebLink
<br /> <br />APPENDIX A <br />Sealing wet holes with abandonment fluid. <br />35 holes, total of 26,400 feet <br />Fluid lOQ/gallon X 1 gallon/foot X 26,400 feet <br />Equipment: $20/hour X 2 hours/hole X 35 holes <br />Labor: $10/man hour X 4 man hours/hole X 35 holes <br />Rig: $70/hour X 2 hours/hole X 35 holes <br />Water truck: 2 hours/hole X $25/hour X 35 holes <br />Water cost: $20/load X 1 load/hole X 35 holes <br />Plugging holes. <br />$28/hole X 35 holes <br />Backfilling mud pits. <br />35 sites X 2 pits/site, 40 yards3/site <br />$60/hour backhoe X 4 hours/pit X 70 pits <br />Regrading drill Dads. <br />1 hour/site X $60/hour small dozer X 35 sites <br />Revegetation. <br />WFC estimate <br />Mobilization. <br /> <br />_ $ 2,640 <br />= 1,400 <br />= 1,400 <br />= 4,900 <br />= 1,750 <br />= 700 <br />TOTAL $12,790 <br />_ $ 980 <br />= 16,800 <br />= 2,135 <br />= 1,050 <br />= 100 <br />TOTAL $33,855 <br /> <br />r 1 <br />U <br /> <br />