Laserfiche WebLink
~~ <br />• II I I II I II I II IIII III • .r~ ~~~ o~ <br />999 <br />STONE CRUSHING <br />24600 County Road P <br />Dolores, CO 81323 <br />RECEIVEf? <br />NOV 13 1997 <br />Bureau of Lend Management <br />San Juan Resource Area Division of M,n~rai;, ,~ iavrl~py, <br />Federal Building 701 Camino Del Rio <br />Durango, CO 81301 <br />Attn: Clyde Johnson <br />Dear Clyde: <br />This letter is N response to the concerns that you had about the Stone gravel pit. After meeting with <br />you and Kirk at the site on November 5, 1997 you asked me to put in a letter what we discussed. <br />1. You recomrnded fencing 25 acres of the pit & keeping all roads open [o travel. After meeting with <br />you and Kirk it was agced that I wuld install a controlled aces gate on the South road <br />leading to the pit site, which would give me the security I need and still give access to rood #4520 for <br />the public to use. No other fencing should be needed until reclamation begins. <br />2. You recomended a plan for noxious weed controll. I also agree that weeds would need to be controlled <br />and 1 would agree to spray once or twice a year as needed. In talking with Kirk, he thought the BLM could <br />assist me initally with this problem because of the weeds that already exist on the site. <br />3. You recomended that the aces road leading to the site be constructed to County specifications. In our <br />meeting at the site it was agreed to all that I wuld could use a "pit run" base to stabilize the road and <br />use smaller gravel for the driving surface. <br />4. You wanted no top soil to be used in construction of roads or other site work. 1 would agree to this. <br />5. You recomended identifing and fencing the possible archaeological site in the Southwest wmer of the <br />property. Al our meeting at the site on November 5, 1997 Cristie with the BLM fiaged out the perimeter <br />of the area being studied and agreed to have it fenced as so as possible to protect it. I will protect that area <br />from any mining, but I have no control over public aces. 1 also would allow any aces to the BLM to the <br />site after mining begins. <br />If this ratifies your concerns please wntact Mr. Thomas Gillis of the Division of Minerals & Geology and <br />inform him so. <br />/~ ~u for your woperation, <br />.~~/y/ j~ <br />Doren Ston <br />