Laserfiche WebLink
-4- <br />12. Primary future (Post-mining) land use (check ooe): <br />_ Cropland(CR) <br />~ Rangeland(RL) <br />_ Pastweland(PL) <br />General Agticultwe(GA) <br />WildlifeHabitat(WL) <br />Residential(RS) _ Recreation(RC) <br />_ Developed Water Resources(WR) <br />_ Forestry(FR) <br />_ Industrial/Cornmercia](IC) <br />SolidWasteDisposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) <br />/ Rangeland(RL) <br />Pas[weland(PL) <br />General Agricultwe(GA) <br />WildlifeHabitat(WL) <br />_ Forestry(FR) <br />Residential(RS) _ Recrealion(RC) <br />Developed Water Resowces(WR) <br />_ Industrial/Cotnmercial(1C) <br />14. Method of Mining: Briefly explain muting method (e.g. ttuck/shovel): Thig area is minPri ncina lnarlPrc anri rlmerc fn <br />move material to the processiTtP.plant. <br />15. On Sile Processing: / Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shoveq: Material will be removed from the mine face, hauled <br />to a processine plant and processed into specification aeereeates for use in construction industry <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. Deseriotlon otAmendment or Conversion: <br />If you are amending or convening an existing operation, provide a brief narrative describing the proposed change(s). <br />