My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128964
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:26:04 PM
Creation date
11/25/2007 6:53:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
Permit File
Doc Date
4/24/2001
Doc Name
RECLAMATION COST ESTIMATE SUMMARY GRISENTI FARMS GRAVEL PIT FN M-2001-005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~~ <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task tt : 002 <br />Date : 04/24/2001 <br />User : LDO <br />State :Colorado <br />County :Fremont <br />Site : Grisenti Farms Gravel Pit <br />Agency or organization name : DMG <br />Permit or other job action :new application bond review <br />Task description :grade Phase 1 pond bank slope <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 25,200 <br /> Utilization <br />Ownership cosVhour : $43.30 NA <br />Operating cosUhour : $66.26 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosUhour : $2799 ~ NA <br />Total unit cosVhour : $137.56 Total fleet cosUhour <br />PermiVjoblt : M-2001-005 <br />Abbreviation :none <br />Filename : M005-002 <br />Horsepower: 305 <br />Swell Loose <br />BCY factor: 1.250 volume: 31,500 LCY <br />Source of estimated volume : exhibit E -reclamation plan <br />Source of estimated swell factor :cat hndbk <br />HOURLY PRODUCTION <br />Average push distance : 60 feet <br />Unadjusted hourly production : 1,438.4 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 15.00 % (neg) <br />Average site altitude : 5,750 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.151 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material'weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />1.10 <br />1.10 <br />1.00 <br />0.83 <br />0.70 <br />1.33 <br />1.00 <br />0.90 <br />1.00 <br />0.63 <br />5137.56 <br />Source <br />908.81 LCY/hr <br />908.81 LCY/hr <br />Total job time : 34.66 <br />Total job cost : $4,768 <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.