Laserfiche WebLink
~ III IIIIIIIIIIIIIIII ~ • <br />Reclamation Cost Estimate Summary <br />Grisenti: Farms Gravel Pit <br />File No. M-2001-00,~ -r>~/O 1 <br />4-24-O1 %J ~" I <br />y,3~ <br />Tnsk No. / Backfill Settling/Water Basins $ 68,725 <br />Task No. 2 Grade Phase I Pond Bank Slope 4,768 <br />Task No. 3 Topsoil Lake Bank, Plant. Settling and Water Pond Areas 6,963 <br />Task No. -1 Remove Dewatering Pumps/pipe and Misc 500 <br />Task No. 5 Revegetate 36.2 acres Plus 50% re-seed cost 10,416 <br />Task No. 6 Mobilize Demobilize D-8 or Equiv Dozer, cat 621 F or Equiv. scraper <br /> Farm tractor and hnpliments, from Florence-Penrose Area 1,000 <br /> Total Direct Cost $92,372 <br /> Indirect Costs 18.5%of Direct ~ 17,089 <br /> Total Reclamation Costs 109,461 <br /> Administrative Fee 5%(Rule 4.2.1(5) <br /> 1 14,934 <br /> Financial Warranty Amount $115,000 <br />M:\oss\AHD\IdoUtcclamation Cost Estimate Summary4-26-Ol.doc <br />