Laserfiche WebLink
r <br />• i <br />9. Dust will be controlled by water application <br />10, The road access from Durant Gulch Road to the plant and <br />stockpile site is included in the nit area. <br />11. Mining may be steeper than 3:1. Slopes will be fin'shed <br />at 3:1 or Flatter with excess overburden. <br />Exhibit D <br />1. The sketch is to indicate that 3:1 or flatter slope will <br />be left. <br />2. The runoff containment berm will be removed, A <br />slope will be provided across the site. <br />3. The fertilizer recommended by staff will be <br />4. The reclamation seeding includes grasses that provi~ <br />high degree of success. Existing trees are cedars, <br />are very difficult to initiate in disturbed areas. <br />may e included, if required.' <br />Exhibit E <br />See enclosed map. <br />a. The haul road is included in the pit area. <br />b. The orientation points include the existing nit <br />Plateau Creek, the power line and the existing s <br />and relatively level field. <br />F..Y. ~ l.: t F <br />1. See enclosed land description, <br />If you have any questions or comments, please feel free <br />contact me and I will gladly help in any way that I can. <br />Sincerely, <br />PARKERSON CONSTRUCTION, INC. <br />a <br />s <br />:avation, <br />=_n Slone <br />to <br />Albert C. Ruckman P.E. <br />