Laserfiche WebLink
List of Tables <br />~~ <br />Page <br />Table 29 Parameters of Column Leach Tests ............ . .......................... 2.05-65 <br />Table 30 Leaching Data for Coal Refuse ............................................. 2.05-67 <br />Table 31 Results of Chemical Analysis ............................................. 2.05-70 <br />Table 32 Time Variation of Quality of Effluent from Backfill Channel.......... 2.05-74 <br />Table 33 Effect of Backfill on Quality of Alluvial Groundwater ........ 2.05-77 <br />List of Figures <br /> <br />Figure 1 Generalized Stratigraphic Section of the Permit Area .................. .. 2.04-10a <br />Figure 2 Regional Map Showing Location of Project Area ....................... ..2.04-6 <br />Figure 3 Typical Embankment Cross Section ..................................... 2.05-12 <br />Figure 4 Water Flow Sheet ................................................................................ ...2.05-13 <br />Figure 5 Pond 001 Design (TR-49) .................................................. ...2.05-16a <br /> (Earlier Figure 5 Deleted by TR-41) <br />Figure Sa Pond 001 Emergency Spillway Design Cross-section ................. ...2.05-16b <br />Figute 6 Proposed RDA Configuration .............................................. .. 2.05-30 <br />Figure 7 RDA Conceptual FiII Configuration ....................................... .. 2.05-31 <br />Figure 8 RDA Generalized Cross Section .......................................... .. 2.05-32 <br />Figure 9 RDA Benched Keyway Cut ................................................ ....2.05-33 <br />Figure 10 This Figure Deleted by TR-41 ............................................. ....2.05-34 <br />Figure 11 RDA Cross Section A-A' Final Configuration ............................. 2.05-35 <br />Figure 12 This Figure Deleted by TR-41 .................................................2.05-36 <br />Figure 13 Grain Size Distribution, Coal Processing Waste ..................... ... 2.05-38 <br />Figure 14 This Figure Deleted by TR-41 ................................................ 2.05-40 <br />Figure I S Typical Lower Permanent Seal ............................................... 2.05-52 <br />Figure 15A Piping for Recycling Qf Slurry ................................................ .2,05-52A <br />Figure 16 Typicai Borehole Seal ......................................................... 2.05-53 <br />Figure 17 Raptor Proof Powerpole Design ..............................................................2.05-56 <br />Figure 18 Electrical Conductivity as a Function of Effluent Volume ............... 2.05-68 <br />f~ <br />TR-49 v (Revised 02/14/07) <br />