My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128795
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:54 PM
Creation date
11/25/2007 6:38:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
10/14/2003
Section_Exhibit Name
Permit Index
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENECA II-W <br /> LIST OF EXHIBITS <br /> (continued) <br />• Rule No.~ Exhibit No. Title Volume <br /> 2.04. 10 10-1 Pzemining Vegetation Types and Sang~le <br /> Location Map 6 <br /> 10-2 Pre-Disturbance Vegetation Types, TAHR 6 <br /> 10-3 Pre-Mining Vegetation Types & Sample Location <br /> Map, II-W South 6 <br /> 2.04.11 11-1 Hig Game Aerial Census Observations 6 <br /> 11-2 Wildlife Sampling Locations 6 <br /> 11-3 Seneca II-W South Extension 1997 Raptor Nest <br /> Location 6 <br /> 2.05. 3 12-1 Seneca II, Yoast and Seneca II-W Coal <br /> Resource Areas 7 <br /> 2.05. 3(21 12-2 Opera[i ons Plan 7 <br /> 12-3 Operations Plan II-W L.O.M. 7 <br />2.05.3(3) 13-1 Facilities Map g <br />2.05.3(41 13-2 Surface Hydrology Map g <br /> 13-2A Surface Hydrology g <br /> 13-3 Surface Water Control Plan Tie-Across Haul Aoad g <br /> 13-9 Watershed Boundary (Partial) e <br /> 13-5 Proposed Pond 005 g <br /> 13-SA Pond 005 As-Built g <br /> 13-6 Pond 006 Phase II As-Built g <br /> 13-6A Pond 006 Phase IV Subwatershed Map g <br /> 13-6B Pond 006 Phase ZV Design 8 <br /> 13-6C Pond 006 Phase IV Pre-Settling Basin Design 8 <br />• 13-7 Proposed Sedimentation Pond 009 8 <br /> 13-7A Sedimentation Pond 009 As-Built g <br /> 13-8 Pond 015 Design 6 Watershed Maps, Sheets 1 and 2 <br /> of 2 9 <br /> 13-8A Pond 016 Design fi Watershed Maps, Sheets 1 and 2 <br /> of 2 g <br /> 13-88 Pond 017 Design 6 Watershed Maps, Sheets 1 and 2 <br /> of 2 9 <br /> 13-8PP Topsoil Stockpile PP Sumps PP-Sl and <br /> PP-SZ (AS-Built) 9 <br /> 13-SQQ Topsoil Stockpile QQ Sunq~ QQ-S1 IAS-Huilt) 9 <br /> 13-gRR Topsoil Stockpile RR Sump RR-S1 (AS-Built) 9 <br />2.05.3 f31 13-10 Typical Aoad Details 9 <br /> 13-11.1 TAHR IAS-Built) 9 <br /> 13-11.2 TAHR (AS-Built) 9 <br /> 13-11.3 TAHR fAs-Built) 9 <br /> 13-11.9 TAHR IAS-Built) 9 <br /> 13-11.5 TAHR (AS-Built) 9 <br /> 13-11.6 TAHR (As-Built) 9 <br /> 13-11.7 TAHR (AS-Built) 9 <br /> 13-11.8 TAHA (AS-Built) 9 <br /> 13-12.1 Mine Entrance Haul Road (AS-Built) 9 <br /> 13-12.2 Mine Entrance Haul Road (AS-Built) 9 <br /> 13-12.3 Mine Entrance Haul Aaad IAS-SUiltl 9 <br /> 13-12.9 Mine Entrance Haul Road (AS-Built) 9 <br /> 13-13.1 Haul Road A (AS-Built) 9 <br /> 13-13.2 Haul Road A (AS-Built) 9 <br /> 13-13.3 Haul Road A IAS-Built) 9 <br /> 13-13.9 Haul Aoad A (As-HUiltl 9 <br /> 13-13.5 Havl Aoad A (AS-Built) 9 <br /> 13-19.1 Plan & Profile, Haul Road H 10 <br /> 13-19.2 Plan E Profile, Haul Road B 10 <br /> 13-19.3 Plan & Profile, Haul Road B 10 <br /> 13-15.1 Plan s Profile, Haul Aoad C 10 <br />• 13-15.2 Plan & Profile, Haul Road C 10 <br />TR-92 3 Aeviaed 1/03 <br />MR'TSm¢+ll~w_;RR <br />
The URL can be used to link to this page
Your browser does not support the video tag.