Laserfiche WebLink
EXHIBIT D • <br />RECLAMATION PLAN <br />Enter pit where there is an old existing pit as map indicates. <br />Remove north side top soil and stock pile. After north side <br />is excavated the existing stock pile and the rest of the top <br />soil will be stock piled to the north to be used to reclaim <br />pit. <br />$4500---------------ESTIMATE COST TO RECLAIM PROPOSED PIT <br />BREAKDOWN <br />$1000-------------Equipment and labor to grade and slope pit <br />to a 2:1 slope or flatter. <br />$2000-------------Placing top soil 6" deep at a cost of $200 <br />an acre. <br />$1000-------------Seeding 120 pounds of Pubescent b Crested <br />wheat grass. The cost would be $100 an acre. <br />$500--------------The cost of any miscellaneous labor, or etc. <br />RECEIVEC3 <br />MAR 2 3 1998 <br />Division of Minerals 8 Geology <br />