Laserfiche WebLink
.. , <br />RIDER TO MINING PERMIT <br />Permit Date: July 26, 1995 <br />Permit No: M-94-117 <br /> <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />Stipulation No. Ol <br />NO DISTURBANCE WILL OCCUR ON THAT PORTION OF THE PERMIT AREA THAT LIES <br />ON THE GOLDEN CROWN CLAIM UNTIL ADEQUATE DOCUMENTATION OF LEGAL RIGHT <br />TO ENTER THE GOLDEN CROWN CLAIM HAS BEEN PROVIDED BY COLINA ORO MOLINO <br />AND ACCEPTED BY THE DIVISION. <br />Stipulation No. 02 <br />NO MILLING OPERATIONS WILL BE CONDUCTED A7 7HE GOLD HILL MILL UNTIL THE <br />TAILING IMPOUNDMENT HAS BEEN EXPANDED IN ACCORDANCE WITH THE APPROVED <br />MINE PLAN, AND UNTIL THE TAILING POND EXPANSION HAS BEEN CERTIFIED BY A <br />PROFESSIONAL ENGINEER, REGISTERED IN COLORADO, AND THE CERTIFICATION <br />HAS BEEN ACCEPTED BY THE DIVISION, <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />~~ <br />MICHAEL B. LONG ` <br />Division Director <br />MBL/ACS/amm <br />3152G <br />