Laserfiche WebLink
<br />. 5 ~t~TE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1l l7 Sherman 51.. Room 215 <br /> <br />Denrer. Colurado 80207 DIVISION OF <br />Phune: 1303) 866-3567 M (N E R A L S <br />FA%:0031 B32~8106 ~ <br /> GEOLOGY <br />May 16 <br />2000 RECLAMATION <br />, MI NING•SAFErY <br />Mr. Michael Reefer <br /> Bill pwpns <br />CAMAS Colorado, Inc. Governor <br />3605 S. Teller St. Greg E. walcne. <br />Lakewood, CO 80235 E:ecuuve Director <br /> Michael 8. Long <br /> V Division Duector <br />RE: Reporting Requirements, Stegner Farms Pit (Permit No. M-99-021) <br />aud_Cooley Reservoir and Fulton Wildlife Area (Permit No. M-99-034) <br />, <br />` <br />Dear Mr. Reefer: <br />On May 3, 2000 the Division of Minerals and Geology (DMG) met with personnel from the State Engineer's <br />Office and Rocky Mountain Consultants to discuss policies and procedures for regulating lined gravel pits. <br />During this meeting, the reporting requirements for slurry wall installation at the Stegner Farms Pit and Cooley <br />Reservoir and Fulton Wildlife Area were also discussed. CAMAS is currently required to provide construction <br />progress reports every two weeks. As you can see in the attached DMG policy memo, we are standardizing the <br />reporting requirements and will now require only a final construction observation report to be submitted <br />following the completion of the facility. <br />If you would like to take advantage of the less rigorous reporting requirement for Cooley Reservoir and Stegner <br />Farms, you may submit a technical revision application for each of the two permits to do so. The DMG will <br />waive the usual technical revision fee in this case. In order to approve the revisions and permit a single final <br />report on slurry wall construction, CAMAS must comply with the other criteria from the attached policy memo. <br />In particular, the technical revision applications must include a commitment that approved plans and <br />specifications will not be altered without prior DMG consent. <br />If you choose to apply for the technical revisions, please include a note with the applications stating that the <br />Minerals Program Supervisor has waived the fee requirement. Otherwise the applications may be rejected in the <br />initial processing step. If you have any questions, please contact me. <br />Sincerely, <br />\..~A^'0.~ ~~ <br />Christina Kamnikar <br />Environmental Protection Specialist <br />enclosure(s) <br />cc' Barb Brunk, Rocky Mountain Consultants (w/enclosures) <br />m:\min\clk\reporting.doc <br /> <br />