Laserfiche WebLink
<br /> <br />NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Haul Road Y-8 <br />Loeatlon: Hayden, Colorado <br />Client: Seneca Coal Company <br />Work Performed: <br />Project No.: 95-2384 <br />Report No.: 86 <br />AUG 2 6 RECD <br />Date: 8/16/96 <br />Time: 1.0 <br />Mileage: 24 <br />EngrJTech: JK <br />As requested, we visited the project site on this date. Since our previous visit, excavation crews hatl placed <br />sandstone rip-rap in fill areas of the roadway (Sta. 48+00 and Sta 53+00 through Sta. 55+00) and density testing <br />was not possible. <br />Verbal Discussions: <br />Chuck McCulloh, of Seneca Coal Company, informed us to return on 8119/96 for nuclear density testing. <br /> <br />