My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128600
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:43 PM
Creation date
11/25/2007 6:22:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
VOLUME 2 MINE PLANNING APPENDIX - ROOF CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAFETY PRECAUTIONS FOR FULL ROOF BOLTING <br />• <br />A full roof bolting plan shall be construed to mean bolting as the <br />primary means of roof support. <br />1. Roof bolts shall be installea in the seduence and manner <br />shown in the accompanying drawincs. <br />2. All roof bolts used as the primary means of roof support <br />will be of the resin anchorage type or point anchor resin <br />anchorage. <br />3. a) All personnel required to install roof supports shall <br />be trained by a qualified supervisor or experienced <br />operator before beind made solely responsible for <br />such v,ork. This training shall ensure that such per- <br />sons are familiar with the functions of the st;ppdrt <br />being used, proper installation procedures, and the <br />approved roof control play, A record of this train- <br />ing shall be Wept at the c,in=_. <br />• b) Supervisors in charge and r.iners w•ho install supports <br />shall be informed of an approved roof control plan <br />and any chanoes that are rrore Stringent than in a <br />previously approved roof control plan not later than <br />their first working shift following receipt of the <br />approved plan. As sodn as possible but no later than <br />three weeks after receipt of this approved plan, all <br />provisions contained herein, shall be fully explained <br />to ali miners whose duties °equire them to be dr a <br />"wanking section," „11 new miners shall have tre <br />hazards of ruine roof and rips and the content or this <br />plan explained to them before they start td work. <br />4. An emergency supply ot` suitable rdof support material in- <br />cluding temporary supports sufficient to support the roof <br />during one complete cycle of mining, will be provided as <br />close as practical to the working places and/or can be de- <br />livered to the v,orking place within thirty minutes. <br />• 5. To enable miners to perform their duties from a safe posi- <br />tion without exposure tc falling material, a bar of <br />Page Six <br />RPVicPd ~iF,/~4/R~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.