Laserfiche WebLink
adjusted production = (350)(.84)(1.20)(1.20)(.84) <br />• = 356 yd3 <br />4066 3 = 1 hours <br />356 yd <br />11 hours x $53/hr = $583 <br /> F~vegetation <br /> $500/ac x 2.1 ac = $1,050 <br /> Revegetation topsoil stockpile <br /> area = 1.8 acres <br /> 1.8 ac x 500/ac = $900 <br /> ~btal Miscellaneous Costs for Section 22 <br /> Ripping - $ 742.00 <br /> 'Ibpsoiling - 583.00 <br /> I~vegetation - 1,950.00 <br /> $3,275.00 <br />• <br /> Miscellaneous Costs for Section 15 <br /> F~claiming overburden stockpile 10 and topsoil stockpile #3 <br /> Overburden stockpile #10 <br /> Assumptions: 1) area 2.5 acres in size <br /> 2) area has to be ripped to a depth of 24" <br /> 3) area has to be topsoiled <br /> 4) area has to be revegetated <br /> 5) use a D9H to rip <br /> 6) use a D9H to push topsoil <br />- Ripping costs - use same assumptions as before <br /> Production - 473 Bj+d3/hr <br /> Yards to be ripped 8067 yd3 <br /> 8067 d3 = 17 hours <br />473 BCY <br /> <br /> 17 hours x $53/hr = $901.00 <br />virz-7 <br />