My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128573
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:42 PM
Creation date
11/25/2007 6:19:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007012
IBM Index Class Name
Permit File
Doc Date
6/7/2007
Doc Name
Responses prepared for 2nd Adequacy Review
From
Randy Schafer
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~q <br />S~ <br />40586 Co. Rd. 21 <br />Haxtun, CO 80731 <br />June 3, 2007 <br />Mr. Thomas Schreiner <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Larson Pit, Regular 112 Application <br />,~fvl-zoo?-o12 <br />Dear Mr. Schreiner: <br />c.~m <br />RECE! UEf~ <br />'JUN 0 7 2007 <br />~O Division of F2 ~ <br />Mining aid S <br />~~b,v1 ; <br />f~AnJp y <br />~~~~~~~ <br />The following responses have been nrenared for your 2nd adequacy review letter mailed <br />after your site visit on May 18, 2007. Responses are shown after each point and are <br />shown in bold. <br />6.4.4 EXHIBIT D -Mining Plan <br />1. The Division is agreeable to the applicant mining the site in three (3) distinct stages, <br />and mining through the existing intermittent stream channel (Sandy Creek) provided the <br />applicant will commit to the following measures: <br />• The entire boundaries of the north and south bank of the stream channel will be <br />clearly marked prior to excavation. <br />Mr. Larson will mark the intermittent drainage channel boundaries in each of the <br />three areas prior to the commencement of mining in that area. <br />• The operator will excavate the stream channel within each section first, and re- <br />establish the boundaries of the channel including north and south banks prior to <br />excavation in the surround in areas. <br />Mr. Larson will mine the intermittent drainage channel first in each area; the <br />second step will be mining outside the channel area, after channel boundaries have <br />been re-established. <br />Following excavation and re-establishment of the stream channel banks and <br />channel dimensions, the operator will conduct a representative cross-sectional <br />survey ofthe re-established stream channel to verify re-establishment of pre- <br />mising channel dimensions. <br />P <br />
The URL can be used to link to this page
Your browser does not support the video tag.