My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128459
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:35 PM
Creation date
11/25/2007 6:10:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
Determination of Hydrologic Consequences, Simons, Li & Associates
Section_Exhibit Name
EXHIBIT 07 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />79 <br />4. Culverts under the major haul road were evaluated for existing capacity <br /> and required capacity for the 10-year, 24-hour discharge. The culvert <br /> on Newlin Creek is inadequate and replacement is required. The culvert <br /> at the end of the Magpie diversion can handle the design discharge with <br /> a build up of head. The existing depression area just upstream of the <br /> culvert provides storage and attenuates the peak discharge out the <br />• culvert. Culvert design and adequacy were discussed in Section 6.2. <br />5. Sediment pond storage and configuration were discussed in Section 6.3. <br /> Sediment pond evaluation was based on design data and field inspection. <br /> The sediment pond calculations are not proposed to be exact. For de- <br /> tailed pond evaluation, field survey of pond geometry is required. <br />~ <br />6. The location of proposed Sediment Pond 'E" has been changed. The orig- <br />- inal location vas directly on the channel which received the Magpie <br />~' Creek diversion flow. The new location is shown on Hydrology Mao 2, <br />• Appendix A. <br />7. All sediment ponds are temporary structures and evaluated for the 10- <br /> year, 24-hour precipitation event. The design criteria for emergenry <br /> spillways is based on the 25-year, 24-hour precipitation event. <br />8. Minor diversions are temporary structures and designed for the two-year, <br /> 24-hour peak discharge. Minor diversion channel "E" vas designed for <br /> the 10-year, 24-hour peak discharge because of the large contributing <br /> drainage area. If the final designs for proposed diversions follow <br /> the criteria presented in this report, they will be adequate in terms <br /> of capability and stability. <br />9. Location of proposed minor diversions "E" and "F" have been changed <br /> from the proposed G.E.C. mine plan to eliminate the need for channel <br /> protection (Hydrology Map 2, Appendix A). <br />30. The present Dorchester Maggie Creek diversion is considered permanent <br /> and thus, required the design of major diversion channels PM-CH-15 and <br /> PM-CH-17 for permanent conditions. <br />11. The existing slope and location of the Dorchester Magpie Creek diversion <br /> required that the major diversions be designed with slopes greater than <br /> <br />• the natural gradient requiring significant riprap protection. <br />12. The restoration channels were designed for stability and conveyance <br /> of flows during the 10-year, 24-hour discharge. Overbooks should be <br /> sloped at 10:1 for conveyance of discharges exceeding the 10-year, <br /> and up to the 100-year, storm event. <br />
The URL can be used to link to this page
Your browser does not support the video tag.