Laserfiche WebLink
• .. • .. • <br />Table 13. Existing and Proposed Sediment Pond Storage Volumes. <br /> Required <br /> Storage <br /> Volume <br /> 10-Year 10-Year Three- For Twiea <br /> Design• 24-flour 24-Hour Annual Yeer Required•• 10-Year Design• Required•• <br />Sediment Storage Runoff Sediment Sediment Sediment Stozaga 24-Hour Spillway Spillway <br />Pond Volume Volumo Yield Yield Volume Volume Runoff Capacity Capacity <br /> (ac-ft) (ac-ft) (lbs) (lbs) (ac-f t) (ec-tt) (ac-ft) (efe) (cfa) <br />"A" 10.7 0.65 5,762 18,438 0.013 0.663 1.313 108.0 36.0 <br />"B" 0.7 0.48 3,871 12,387 0.009 0.489 0.969 10.6 23.2 <br />"C" 17.0 3.42 13,874 44,397 0.032 3.452 6.872 154.2 107.1 <br />"D" Alt. 1 ---- 16.35 331,340 1,060,288 0.760 17.110 33.460 ----- 469.0 u. <br /> Y <br />Alt. 2 ---- 1.13 8,183 26,185 0.019 1.149 2.279 ----- 43.0 <br />"T" 4.6 2.25 16,720 53,504 0.038 2.268 4.538 47.2 69.2 <br />"E" ---- 1.11 8,038 25,722 0.018 1.128 2.238 ----- 42.2 <br />"F" 8.4 2.90 22,747 72,790 0.052 2.952 5.852 118.0 107.9 <br />"G" 1.2 0.64 4,635 14,832 0.011 0.651 1.291 26.0 30.0 <br />• Design storage volume and spillway discharge based on criteria presented in present and past C.E.C. <br />permit applications. <br />•• Required storage volume and spillway discharge based on MULTSED results. <br />