Laserfiche WebLink
<br />r <br />TABLE OF CONTENTS <br />Page <br />LIST OF TABLES v <br />LIST OF FIGURES. .vii <br />LIST OF E%NIBITS .vii <br />I. INTRODUCTION <br />1.1 General 1 <br />1.2 Scope 1 <br />[_ 1.3 Available Information 2 <br />r II. ADJUSTMENT OF PRELIMINARY DATA AND MULSTED CALIBRATION <br />• 2.1 <br />2.2 <br />2.3 <br />2.4 <br />2.5 <br />Rainfall. 5 <br />Growd Cover and Impervious Area. 6 <br />Sediment Size Distribution. 6 <br />watershed Segmentation and Geometry 6 <br />Typographical Corrections for <br />Preliminary Data Base Report. 10 <br />III. PRESENT-MINING CONDITION RESULTS <br />3.1 Magpie Creek Draiange 17 <br />3.2 Newlin Creek Drainage 19 <br />3.3 Tipple Arna Drainage. 20 <br />IV. POST-MINING CONDITION <br />4.1 Magpie Creek Drainage 22 <br />4.2 Newlin Creek Drainage 24 <br />4.3 Tipple Area Drainage. 24 <br />V. VERIFICATION OF RESULTS <br />5.1 Comparison of Regression Equations <br />for Peak Rwoff 27 <br />. 5.2 Comparison of Suspended Sediment Concentrations <br />Entering and Leaving the Lease Area 29 <br />5.3 Monitoring Station Data 30 <br />5.4 water Qualiey Analysis. 30 <br />iii <br />