My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128458
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:35 PM
Creation date
11/25/2007 6:10:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981021
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
APPENDIX A PART 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S undisturbed and disturbed Lands, respectively. Weighted (by <br />area) curve numbers for the various tributary areas were <br />computed and are sho~::n or. Plate 21 entitled Hydrology <br />Summary', along with the 10-, 25- and 100-year runoff volumes. <br />• <br />• <br />Peak Flows <br />Peak rates of runoff for each pond tributary area were <br />calculated for the 10-, 25- and 100-year, 24-hour duration <br />precipitation events in accordance with Procedures for <br />Determinine Peak Flows in Colorado, a publication of the SCS <br />dated ?larch, 1977. Peak discharges were determined from the <br />drainage area and weighted curve number, with adjustments <br />made for basin shape and slope. Shown on the Hydrology <br />Summary (P1ate21 ) are the peak discharge rates for the 10, <br />25 and 100-year flood events for each pond. <br />PONDS <br />The sedimentation ponds will be located as shown on Plate l7 . <br />Plate 22 entitled Pond Schedule, contains a schedule of <br />information describing each of the ponds. The total <br />constructed heights range from 8.0 feet to 11.5 feet, and the <br />pond volumes range from 1.8 acre-feet to 8.3 acre-feet. A11 <br />the embankments have a minimum 10-foot crest width and side <br />slopes of 3:1. All embankments are shown in plan on Plate 17 <br />and schematic cross-sections are included in Plates 23-26. . <br />Pond embankments are to be adequately compacted during con- <br />struction. <br />~~ - .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.