Laserfiche WebLink
ACCESS <br />ROAD <br />IFj <br />DIVERSION <br />DITCH <br />DIVERSION <br />/ DITCH <br />DIVERSION <br />/ DITCH <br />3° <br />z <br />>J <br />G' <br />Z. <br />FINAL PILE CONFIGURATION <br />1% MIN <br />DURING CONSTRUCTION <br />SEE DETAIL A -A' <br />FOR LIFT CONSTRUCTION <br />CROSS SECTION A -A' <br />NO SCALE <br />FINAL PILE CONFIGURATION <br />PACTED REFUSE <br />CROSS SECTION B -B' <br />NO SCALE <br />1% MIN <br />TYPICAL REFUSE PILE <br />DURING CONSTRUCTION <br />(no scale) <br />1% MIN --- <br />D REFUSE <br />DIVERSION <br />DITCH <br />SEDIMENT <br />DIVERSION <br />, DITCH <br />W <br />p <br />p <br />U <br />p <br />p <br />W <br />p COMPACTOR <br />Op <br />p <br />O <br />p <br />p <br />0 DRYING UNCONSOLIDATED <br />p <br />0 <br />p <br />0 <br />p MATERIAL <br />3150 <br />68 RECEIVED <br />1575 <br />36 <br />- FUTURE LIFT <br />COMPACTED LIFTS I 12" TO 24' LIFT <br />LaMOn�oevEMOeMr <br />ON C:D Ma <br />DIVERSION DETAIL A -A' <br />TYPICAL LIFT CONSTRUCTION <br />DITCH <br />NO SCALE <br />Note: Refuse Area 1 final configuration is shown on Map 77 <br />Rim <br />SITE MAP <br />SCALE: I"=1000' <br />NORTH <br />LEGEND <br />BOUNDARY OF REFUSE SUB- AREA <br />5A REFUSE SUB -AREA DESIGNATION <br />HAUL ROAD <br />FUTURE HAUL ROAD LOCATION <br />ESTIMATED REFUSE <br />AREA CAPACITY <br />SUB -AREA (ACRES) (ACRE -FEET) <br />1 <br />2 -3 &4 COMBINED <br />5A <br />5B <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />13 <br />325 <br />55 <br />2390 <br />66 <br />2565 <br />68 <br />1400 <br />29 <br />625 <br />20 <br />200 <br />11 <br />60 <br />112 <br />3150 <br />68 RECEIVED <br />1575 <br />36 <br />550 <br />AUG 2 6 2004 <br />Division of Minerah and Geology <br />RECEIV) <br />and Geology <br />i <br />BLUE MOUNTAIN ENERGY, INC. <br />DESERADO MINE RANGELT, COIARADO <br />REFUSE AREA DISPOSAL MAP <br />� <br />D D.G.A. D� . MAP78.DWG <br />AS SHOWN 8/30199 <br />(u Oq <br />