Laserfiche WebLink
Permit Date: January 15, 2003 <br />Permit No: M-2000-098 <br />The following additional stipulations and conditions form an integral part of the foregoing pemrit: <br />Stipulation No. Description <br />Once specific areas have been identified within the permit boundary where limestone <br />and dolomite are to be quarried (mined}, the Operator shall submit a revision to the <br />permit, to the Division, prior to conducting any quarry operation for limestone or <br />Dolomite. The revision shall be a Technical Revision if the currently proposed mining <br />and reclamation plans are not being altered (changed). The Technical Revision shall <br />include an accurate mining plan map showing the direction of mining and an accurate <br />reclamation plan map showing the expected topography of the reclaimed lands. The <br />maps must accurately delineate the limestone and dolomite areas, in addition, the <br />exhibit maps must comply with requiremerrts of Rule 6.1. If the operator proposes to <br />significantly change the mining plan, which may significantly change the reclazmation <br />plan, in the limestone and /or dolomite areas, an Amendment to the pemrit must be <br />submitted to the Division. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTIMENT OF NATURAL, RESOURCES <br />RONALD W. CATTANY <br />Division Director <br />