Laserfiche WebLink
-3- <br />determined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have been perforrrred upon such lands has <br />not beam performed, and <br />ii. that Snancial warranty forfeiture proceedamgs described in the Ad or similar <br />provisions of subsequent laws, if arty, have beam initiated. <br />c} The Divisiam, acting for the Board, will amter lands to respormd to an emergency only <br />where the Division deterines that any of the conditions of Construction Material Rule 8.4,2. exist. <br />n The additional conditions set forth m the attached rider, if any, are incorporated herein by <br />r~eferamce. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPART71~fENT OF NAT'UKAL RESOURCES <br />MICHAEL B. LON <br />Division Director <br />