Laserfiche WebLink
1 <br />i <br /> <br />D.10 Ancillary Facilities <br />D.10.1 Haul Roads <br />' Haul road locations are shown on Figure C-2. Haul <br />roads will be 70-ft wide, including internal ditches and <br />any MSHA required safety berms. The haul roads are sized <br />to accommodate two-way traffic. The pit to mill haul <br />road crosses the County Road. The crossing has been <br />' designed in an area of maximum visibility and numerous <br />warning signs will be posted in all direci.ions. <br />' D.10.2 Power Suooly <br /> <br />i <br /> <br />' D.10.3 <br /> <br /> <br />Project power will either be supplied by tying into <br />existing nearby powerlines, by generating power on site <br />through a large diesel generator, or by a combination <br />of these two alternatives. The power demands for this <br />project will be approximately 7,000 kilowatts. <br />Water Suooly <br />The mining and milling operations for this project <br />are expected to require a maximum water supply of <br />approximately 200 gpm during normal operations. <br />All water resources used for the project will have <br />the appropriate water rights approval prior to any water <br />use for the project. Project water will be piped to the <br />1 site for storage in tanks located adjacent. to the mill <br />facilities. Small amounts of groundwater intercepted <br />' during mining will be used in the mining and milling <br />operations. Leaching or processing of ore will not <br />' commence until the operator obtains, and submits to the <br />Division, water rights and any required changes in points <br />of diversion or augmentation plans. <br />1 <br />D-71 !Revised 4/20/89) <br />r <br />