Laserfiche WebLink
<br />' are greater than the required 1.5 static factor and 1.0 <br /> pseudostatic factor. <br /> <br /> The results of analyses for the waste rock disposal areas <br />' A, B, C, and D and the East Pit on the north side of the Rito <br />i Seco are summarized on Figures D.3.5-2, D.3.5-3, D.3.5-4, <br /> D.3.5-5, and D.3.5-6. The analyses indicate that the minimum <br /> static FOS for the critical slip surfaces associated with the <br /> full-height slope, single benches and infinite slope analyses <br /> are identical to those obtained for the south waste <br /> rock/tailings disposal area. These FOS are acceptable for the <br />t same reasons noted earlier. <br /> D.4 Crushing Facilities <br /> D.4.1 Description of Crushing Facilities <br /> <br /> A crushing plant will be constructed adjacent: to the mill <br />' between the leach pad and the southern waste rock disposal area <br /> (Figure C-2). The crushing plant will consist of a primary jaw <br /> crusher, a secondary cone or gyratory crusher, a tertiary cone <br /> crusher, and one of two quaternary Barmac crusher. Run-of-mine <br />1 material is fed to the jaw crusher which will crush the <br />t <br />i <br />t <br />l <br />th <br />i <br />l t <br />i <br />ht i <br />h <br />F <br />h <br /> e <br />y e <br />es. <br />rom <br />ma <br />er <br />a <br />o approx <br />ma <br />g <br />nc <br />e jaw crus <br />er, <br /> the material passes through a double deck screen for <br /> separation. Material larger than 3/16 inches is sent to the <br /> cone crusher for secondary crushing. Material meeting the minus <br />' 3/16-inch size requirement is sent to the heap leach stockpile <br /> or the fine-ore bin, depending on the grade of the ore being <br />1 crushed. Lower grade ores will be heap leached, while higher <br /> grade ores will be milled. <br />i Discharge from the cone crusher is run through a double <br />deck vibrating screen and then directed to either the tertiary <br />' crusher, the heap leach stockpile, or the fine-ore bin. <br />Material from the tertiary crusher is directed back through <br />1 <br />D-26 <br />