Laserfiche WebLink
~ y <br />BTERl.ZNG READY-MIX CANCRETE +,~IaAter Pit <br />112 Applioation <br />Pebruart 42, 1977 -t- <br />imetable o! A^.+ floe fCont'd); floatlag area for the drtage to b• used <br />in rile operation during the years 1971 <br />t~6 1991, 11.61 acres will be worked. <br />During the yearn 1992 through 1997, 6 <br />~ '.rsa will be corked. Durins t!N years <br />8 through 2004, 9 acres Y111 be worked. <br />Stage I will start in j1P17 starting on <br />the northwest and of the property and <br />working south. Completion data is •ati- <br />autad to ba 1991, <br />Stags II will start in 1992 atarti~f on <br />tfa southeast part of the ymparty and <br />working north to a diagonal Line approxi- <br />mately even with the g~line Electric <br />Association overhead tine. Completion <br />date 1• setimated to be 1997. <br />f' <br />r <br />Stage III ~.~ill start in 1998, starting <br />nt the Highline Electric Aaaociatioa.and <br />working north to the end of the area. <br />Completion date is eatiwtad to be 2004. <br />Reclamation plan; The reclaimed land will be a wildlife <br />and nature area. Reclamation will consist <br />of two lakes, the western one appro:lYtely <br />17.61 acres more or less, and the autsrn <br />lake approximately 15.00 eases, msrs.or leas. <br />The lakes will be properly eloped vfth 3:1 <br />Blopea from ten feet below the average <br />seasonal eater line Lo five feat above th• <br />average seasonal water-line. On the banks <br />of the lakes and 1n the area between the <br />lakes, the vegetation disturbed by the <br />dredging operations and related mining <br />activity will be reclaimed and will ba <br />revegetated to plants adapted to the area. <br />The land area will ba approxiwtaly 17.94 <br />acres. Total affected sores rill be 46.55 <br />acres. A dike will ba built along the <br />north property lino and a small dike will be <br />built on the vest aide of the •net lake for <br />flood control. Presently there 1a a dike <br />along the vest side of the lovlina ditch. <br />Both dikes will ba broad on top with alopea <br />of 5:1 and will blend into a 3:1 slops <br />along the water lino of the lake, <br />