My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128172
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:18 PM
Creation date
11/25/2007 5:46:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981029
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.03.10 IDENTIFICATION OF OTHER LICENSES & PERMITS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P2RT i <br />?age o <br />Permit Yo. COC-850000 <br />• <br />B. EFFLUENT LI:`tIT2Ti0NS 2ND MONITORING REQUIRE."!ENTS <br />1. Effluent L'_micacions (continued) <br />d) Burden at Proof Requirement <br />The permittee has the burden of proof <br />total suspended solids (TSS), total i <br />limicacions. Relief shai'_ be granted <br />not be granted :hen the perniccee has <br />The eermictee should endeavor co meet <br />whenever possible. <br />:Then requesting relief from <br />.on and/or settleable solids <br />only :Then necessary and shall <br />ccncroi over tae discharge. <br />tae primar-~ limitations <br />1) For rainfall co naive TSS and coral iron limicacions, it is <br />necessary co prove that discharge occurred within 43 hours after <br />measurable precipitation has stopped. In addition, co waive <br />settleable solids limicacions, is is necessary co prove that <br />discharge occurred within 48 hours aft=_r precipitation greater <br />tsar. the 10-year, 24-hour event has stopped. <br />• <br />2) For snowmelt. to waive TSS and co cal iron limicacions, is is <br />necessary co prove that discharge occurred within ~8 hours after <br />pond inflow has stopped. In addition, to waive settleable <br />solids Limitations, is is necessary co prove twat discharge <br />occurred within 48 hcurs altar pond inflow volume greater roan <br />the i0-year, 2+-hour event has stopped. <br />The Div'_sion saa11 determine the adequacy o[ proof. 2s part of <br />this decermiracion, the Division shall evaluate whetaer the <br />permittee could have controlled the discharge in such a manner coat <br />primary limitations could have been me c. 211 manual dewacering <br />must meet TSS and total iron limitations. <br />2. Stormwacer Manae=aenc ?Lan <br />The permittee shall prepare and submit c:ro coo ies o[ a StJrmwat2r <br />Management ?'_an (S'TlP1 co tae hinter Quaiic•r Control Division. The <br />plan shall be submitted wicai^ si:c monoas 'tom .!:e jot=_ -oat <br />certification under :his ter~i- vas ~-snc=_^ ca the ac:li°~. 2n <br />additional coov o[ the Dian sail be submitted to: <br />Colorado Department o[ Natural Resources <br />Mined Land Rec'amacicn Division - Coal ;4ining Section <br />423 Cancennial 3uildir.g <br />1313 Sherman Screec <br />Denver. CO 80203 <br />The Division •:i11 review and aoorove earn clan <br />plan saa11 be incprpocated _ncp tae permittee' <br />• re.erence. uai:ure ro :moiemeac .ae ;porpved <br />be a vLO iat_on o[ the pe rmi=. -az pan saai: <br />as tae _ac___- -., -eg•iiatad :•, _ •~DPS teem:=. <br />Upon approval, the <br />s cer=:_.c.:cion by <br />~ u n as tescribea shall <br />remain :~ ~[_'ect as Lcns <br />
The URL can be used to link to this page
Your browser does not support the video tag.