Laserfiche WebLink
<br />ANli+1ENDMENT <br />Ellis Allen Pit - File No. M-$4-1$5 <br />Exhibit E. <br />1. ~~+hen mining is completed no slopes will be left steeper <br />than 4:1. No reclamation will be done on the streambed <br />itself, but the se rvice area and the clay pit area will <br />be reclaimed following the SCS recommendations. <br />2. The service area and the clay pit area will be graded <br />to natural contours, fertilized, seeded and mulched as per <br />recommendations. <br />The SCS forms and recommendations will be forwarded <br />as soon as they are received. <br />3. The mining plan follows our usual proceedure. Material <br />is dozed into a stockpile, loaded with a front end loader <br />into dump trucks and hauled to the work site. Stockpiles <br />of material are not left for any great length of time. Usually <br />b to 6 weeks. <br />RECEIVED <br />JAN 0 8 1985 <br />MINED LAND RECLAMATION DIVISION <br />Colo. Dept. of N~tunl Resources <br />