My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128114
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:15 PM
Creation date
11/25/2007 5:39:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977197
IBM Index Class Name
Permit File
Doc Date
3/7/1978
Doc Name
HART ROK REDI MIX APPLICATIONS FN 77-195 77-196 AND 77-197
From
MARK A HEIFNER
To
KENNETH A BAKER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />tiarelt 7, 1978 <br />Kameth A. Baker. P. C. <br />P.O. Box 1083 <br />Salida, CO. 81201 <br />Dear Kr. Bekart <br />a ~~~~~~~~~~~~~~u~~~ <br />thank you for your letter of January 31; 1978. The delay has been caused <br />by the raeignatioo of Mr. Colbert and difficulties encou=fared in assum- <br />ing all of hia previous reaponsibilitias glue my norms]. duties. Bopalully. <br />wa can expedite your applications In the near future. <br />I will send your letter of credit to our Assistant Attorney General for <br />tsvisw as adequacy of bond. !ou oust uodsrstand that Chia bond vas not <br />for the permits which appear to have not been brought before the Board <br />yet, but as surety under the compliance plan. tour applications are still <br />pending. <br />At the Board's February ueeting, it was detarnioed that all those operators <br />who failed to fully comply with the deadlines of the cawplianca plan coat <br />show cause at the March Board neeting why a Cease and Desist Order not ba <br />issued. IC appsats to r that the last that only your bond wu late and <br />that you art all otMr deadlines 1a Eood cause for not ha~ina a Gus and <br />Deaiat Order issued. Tha Board has alrudy artandsd one compliance plan, <br />but they t+Lh sack operator to be ~udsed on the write of hia ova cans <br />and eircumatancee. <br />Prior to the March Board maatlnE. I intend to bacora familiar with your <br />three applications end the history of your file •o that I can sower say <br />of the loard'• questions. At this point my raconendation to the Doard <br />could ba to accept and to extend your eotrpliaacs plan becaua• it appears co <br />ar Bart Rok las made a good faith effort to comply with the lw. <br />IL you haw any qusations. please call. <br />Biacerely. <br />1Lrk A. Banner <br />teclamation 8paeisliat <br />NABtpu <br />
The URL can be used to link to this page
Your browser does not support the video tag.