Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />J <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />ATTAC@4:NT 1 <br /> <br />5. Operations at the facility will be a sand and gravel mining and <br />crushing operation. <br />Principle products will be Road Base Aggregates and Asphalt Aggregates. <br />Months and duration of operation will vary according to specific <br />construction projects. Operations could be conducted at any time <br />during a year. <br />Discharges will be those from pit dewatering. <br />7. No pu611c water supply intake is within 5 miles downstream of the site. <br /> <br />