Laserfiche WebLink
-~'- <br />-2- <br />(5) Bonding: The applicant has proposed additional surety be posted for <br />monitoring and redesign of plan components, as follows; <br />Item <br />Final design of topography, including <br />drainage, based on actual field conditions <br />Location, exploration, and design of <br />cascade structure <br />Exploration, evaluation, and design of <br />dam spillway <br />Riprap and drain junction design <br />Pit wall topographic monitoring <br />Total <br />Cost <br />$11,000.00 <br />10,000.00 <br />17,000.00 <br />5,000.00 <br />$16,000.00 <br />$59,000.00 <br />With the specification of acceptable monitoring facilities and plans for both <br />landslide stability and consolidation/settlement phenomena, the geotechnical <br />aspects of the amended reclamation plan amendment would be acceptable. <br />/ep <br />cc: Ed Bischoff <br />Doc. No. 3992 <br />