Laserfiche WebLink
<br />CIRCES Cost Estimation Software <br />Agency or organization name :Division O/Reclamation, Mining And Safety <br />Task # : 10C State :Colorado Permitfjob # :X142-1 D <br />Date :07/022007 County : Mottat Abbreviation :none <br />User: JHB Site :Third ParkEzploration Filename :X-fO-fOc <br />Permit or other job action :2007 Noi Exploration Holes <br />Task description : Mobilizeldemobilize equipment from Grand Junction <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic lolding gooseneck, drop deck equipment trader (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br /> OperatingcosUhour: $44.38 $46.13 $50.07 <br /> Operator cosUhour : $27.66 $27.66 $27.66 <br /> HelpercosUhour: $0.00 $25.39 $25.39 <br /> Total Unit CosUhour : $88.67 $117.55 $125.45 <br />sheet 1 of 2 <br />