My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127759
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:53 PM
Creation date
11/25/2007 5:13:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984062
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 OPERATION & RECLAMATION PLAN PG 1 TO 89
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• structures that are not submitted with the general plan will be submitted <br />to the Division. The Division shall have approved, in writing, the <br />detailed design plan for a structure before construction of the structure <br />begins. <br />(ii) Each detailed design plan for a structure shall: <br />(A) Be prepared by, or under the direction of, and <br />certified by a qualified registered professional engineer with assistance <br />from experts in related fields such as geology, land surveying, and <br />landscape architecture; <br />(B) Include any geotechnical investigation, design, <br />and construction requirements; <br />• (C) Describe the operation and maintenance <br />requirements for each structure; and <br />(D) Describe the timetable and plans to remove each <br />structure, if appropriate. <br />(iii) If a reservoir has a capacity of more than 1,000 <br />acre-feet, or has a dam or embanloDent in excess of 10 feet in vertical <br />height, from the bottom of the channel to the bottom of .the spillway, or <br />has a surface area at high waterline in excess of 20 acres, then each plan <br />under 2.05.3(4)(b) or (c) shall meet the applicable requirements of the <br />State Engineer in accordance with C.R.S. 37-87-105. In cases where a <br />sedimentation pond or impoundment meets or exceeds the criteria of 30 CFR <br />• 77.216(a), then the permittee shall also comply with the applicable <br />2.05 - 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.