Laserfiche WebLink
<br />Trapper Mine Gravel Permit - Addendum to Exhibit B <br />1.0 Time Table <br />Topsoil stripping will start immediately after permit approval. Mining <br />will begin after all topsoil has been stripped. Mining will occur for approxi- <br />mately 5 years. After mining has ceased, reclamation activities will begin. <br />The entire project should be complete by the fall of 1989. <br />2.0 Topsoil Stripping Dep[hs <br />Topsoil depths Eor the permit area range form 0" to 12". The mean strip- <br />pable depth is 7.2". <br />