• 7-4 Pond 003 <br />The SEDCAD+ Version 3 demonstrations appropriate to Pond 003 are <br />C:\SEDCAD3\CR7\PND3A23, Date 02-01-1996 Time 11:16:01 (10-year, 24-hour precipitation <br />event) and Time 11:18:34 (25-year, 24-hour precipitation event). Contributing watersheds drain, <br />via ditches 3Na, 3Nb, 3Nc, 3N1, 3N2, 3Sa, 3S6, 3Sc, and 3Sd to Pond 3. Watershed definition <br />is based primarily on degree of slopes. The steep watersheds are characterized by repetitive <br />terraces and benches. Pond 003 configuration is taken from the Sedimentation Pond As-Built, <br />Pond 003, date 5-30-91. Rev. 1 and Kaiser Steel Resources Chimney Rock Mine Sedimentation <br />Pond 003 Embankment Design Change Permit C-81-023 TR-23 ll-2b-90. The as-built <br />configuration [baffle plate over the lower third of a 24-inch corrugated metal pipe (CMP) trickle <br />tube] of the primary spillway is not compatible with SEDCAD+ documentation. To simulate the <br />as-built configuration, a trickle tube of equal azea (10.4-inch CMP) was used, placing the top of <br />both tubes at the same elevation to better match dischazge flow characteristics. Kaiser Steel <br />Resources, Inc., proposes to maintain the water level of the pond below 6457.5 (Maintenance <br />Water Level) by pumping. This operational procedure is simulated by a fixed siphon tube. Basin <br />capacity information and curve (SEDCAD+ BASIN CAPACITY UTILITY Pond 3) were <br />developed from the Stage Storage Data on the As-Built. With regard to a 10-yeaz, 24-hour <br />precipitation event, the design sediment storage volume is 0.03 acre feet, between elevations 6456 <br />and 6456.23. Peak Settleable Concentration of pond dischazge is demonstrated at 0.00 mUl (< <br />0.50 ml/1 criteria). Peak stage is 6461.09 (below the 6461.4 elevation of the emergency <br />spillway). There would be no dischazge over the emergency spillway. The caution statement <br />• (SEDCAD+ Pond InpuUOutput Table) is generated due to the proximity of the top of sediment <br />storage and the simulated fixed siphon tube, and is not applicable to actual conditions. Cleaning <br />of sediments from the pond is scheduled when 60% (0.018 acre feet) of the design sediment <br />storage is occupied, a maintenance sediment elevation of 6456.14, interpolation between 6456.0 <br />@ 0.0 and 6456.23 @ 0.03). Peak stage from a 25-yeaz, 24-hour precipitation event is 6461.62, <br />providing 1.38 feet of emergency spillway freeboard to the top of the embankment. Peak <br />dischazge over the emergency spillway is 4 cubic feet per second (cfs) (interpolation between 1.8 <br />@ 6461.50 and 11.0 @ 6462.00). Riprap is required to protect the emergency spillway crest and <br />exit channel. The SEDCAD+ RIPRAP CHANNEL DESIGNS demonstrate that the design depth <br />would be (with 1 foot of freeboard) 1.20 feet across the crest (l.b provided) and 1.02 down the <br />exit channel. Pond configuration is summazized in the figure titled Sedimentation Pond 003 <br />Supplemental Information, 2/7/96. Designs of ditches 3Na, 3N6, 3Nc, 3N1, 3N2, 3Sa, 3Sb, 3Sc, <br />and 3Sd are presented under Pazagraph 7-7. <br />7-5 Pond 004 <br />The SEDCAD+ Version 3 demonstrations appropriate to Pond 004 are <br />C:\SEDCAD3\CR7\PND4A7, Date 01-17-1996 Time 12:48:32 (10-year, 24-hour precipitation <br />event) and Time 12:49:47 (25-year, 24-hour precipitation event). A narrow strip of ground west <br />of a ridge near the western edge of the Barren Ridge Area (see Map 8) and an undisturbed azea <br />above the disturbed azea drain, via ditches 4Na and 4Nb, to Pond 4. Slopes of an undisturbed <br />ridge that make up the eastern side of Pond 4 also drain into the pond. Watershed definition is <br />based on degree of slopes and vegetative cover. The steep watersheds with disturbed azeas aze <br />. characterized by repetitive terraces and benches. Pond 004 configuration is taken from the <br />Sedimentation Pond As-Built, Pond 004, date 7-7-91, Rev. 1. Additional as-built configuration <br />detail concerning weep holes in the primary riser are indicated on Sedimentation Pond 004 <br />Supplemental Information 1/96. Basin capacity information and curve (SEDCAD+ BASIN <br />7-7 8 May 1996 <br />