Laserfiche WebLink
Procedure to Determine Compliance <br />With State Engineer's Criteria for Seated Gravel Pits <br />1. Survey the pit perimeter at the tce and shoulder of the pit slope. <br />2. Record all ground water discharges over a 90 day period including: <br />• Use of a metered pump; <br />• Log pumped discharges 5 days a week over 90 calendar days; <br />• At approximately the same time each day, record the amount <br />discharged, the date, time of day and weather. <br />3. Take pictures of the pit on a regulaz basis. <br />4. At the end of the 90 days calculate the ground water seepage using the <br />State Engineers formula to compute leakage for sand and gravel pits. <br />5. Contact the State Engineers Office in Greeley to schedule an inspection of <br />the pit. <br />6. Provide the State Engineer with copies of the log, pit pictures, perimeter <br />survey and leakage calculations. <br />