Laserfiche WebLink
I. INTRODUCTION <br />A. SITE NARRATIVE <br />Beginning January 2007 and ending December 2007, approximately 850,000 tons of <br />sand and gravel will be excavated from this site and hauled off for use as highway <br />construction fill on Interstate 25 between Colorado Highways 52 and 119. Sand and <br />gravel will be excavated using front end loaders which will dump the excavated sand and <br />gravel into haul trucks, The haul trucks will transport the sand and gravel to the job site <br />where it will be used as structural fill. <br />Activities at this site may include the following: excavation and stockpiling of <br />topsoil and overburden, pit dewatering, excavation of sand and gravel, hauling sand and <br />gravel, grading, topsoiling and site reclamation <br />