Laserfiche WebLink
FORKS: ~~ ~~ ~~ ~~ ~~ ~ ~ ~ sheet2 oft <br />Aster, Smooth stet laevis 0.30 Native NA 5.2 4140.07 <br />Flax, Lewis Blue l.lnum /ewisii 0.50 Native NA 3.3 f4.73 <br />Burnett, Small (ol Little) - Dear SanguisortH minor 2.80 Introduced NA 3.5 5/6.35 <br />ABaBa -Ranger (inoculated) Medicago saliva 0.70 Introduced NA 3.4 Sf.67 <br />Milk Vetch, Cicer - Lutana straga/us titer 1.10 Introduced NA 3.7 55.23 <br /> <br /> <br /> <br /> <br />SHRUBS AND TREES (seetl) <br />Bittertnlsh, Anlebpe <br />Purshia Mtlentata 8.30 Native NA 2.6 8289.09 <br />Rose, Woody Rosa woodsii 2.70 Native NA 0.0 5702.61 <br />Sagebrush, Silver rtemisia Cana 0.10 NaBve NA 1.9 58.86 <br />Sattbush, FOUr Wing Mplez canescens 2.40 Native NA 3.3 $35.02 <br />Serviceberry me/anchier a/ni/olia 4.80 Native NA 8.8 5388.74 <br /> <br /> <br /> <br /> <br />• TOTAL SEEDS I SO. Fr.: 75.4 <br />Seed appliC2U9n -method <br />TOTAL POUNDS PLS/ACRE: 34.50 <br />'TOTAL SEED MIX COST/ACRE: S1,OSB.2B <br />TOTAL SEED APPLICATION COST/ACRE: 570.75 <br />MULCHING and MISCELLANEOUS DESCRIPTION (data source) UNITS/ACRE UNIT COST/UNR COST/ACRE <br />Material -item no. 1 : Straw, delivered (DMG survey data] 2.00 ton 594.25 $188.50 <br />-item no. 2 <br />-item no.3: <br />- item no. 4 <br />TOTAL MULCH MATERULLS COSTI ACRE: §186.$0 <br />AoDlication -method no.l:POwer mu/cher (MEANS 029105000350) 580.98 <br />- methOtl no. 2 : Camping, with tractor (DMG survey data) $52.59 <br />- methotl no. 3 <br />TOTAL YULCN APPUCATK)N COSTI ACRE: 5113.57 <br />NURSERY STOCK PLANTING ~ TYPE~antl SIZE ~ MATERIAL PLANTING COST/PERT. ~~ TOTAL ~ TOTAL <br />~~ <br />I <br />PELLET COST / PLANT COST / ACRE <br />COMMON NAME NO. /ACRE (Dlantinq cost tlata source) COST /PLANT COST / PLANT <br />No nursery stock reouired <br />TOTAL NURSERY STOCK COST I ACRE : $0.00 <br />JOB CO T No. of acres : ~ 1.56 ~ Cost /acre : 51,097.19 INIrwL JOa cOSi : $2,335.61 <br />Estimatetl failure rate (percent): 50.00% Cost/acre': Ei,429.i1 RESEEDING J06 COST: $1,114.70 <br />• Selected replan9ng work items : S M TOTAL JOB COST : 53,450 <br />