Laserfiche WebLink
CIRCES Cost Estimatins~ Software <br />Task # : Z01 <br />Date : 0829/2005 <br />User: JRS <br />State :Colorado <br />County : Delte <br />Site :Bowie No. 2 Mine <br />Agency or organization name :Colorado Division O1 Minerals And Geology <br />Permit or otherjob action :Technical Revision 41 <br />Task description : PIUg end Set/ Three GOb V@nf BOreh01BS <br />UNIT COSTS <br />Ecuioment cost data source : NA Shift basis : 1 cer daY <br />BOREHOLE DESCRIPTION SEALING ITEM I METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />-Bottom Plug PVC plug - 8 in. 8" NA 3.00 EA $136.99 $410.97 <br />-Fill Holes with Cement Portland cement greut 8" 3,525' 410.00 bag $8.25 $3,382.50 <br />-Cut Casing of Surtace Exp. casing removal, 8-16 in. 8" NA 3.00 LF $10.90 $32.70 <br />-Borehole Marker Borehole marker NA NA 3.00 EA $3.37 $10.11 <br />-Drill Rig Time TLAS COPCO ROC L6, 6.0 in NA NA 24.00 HR $215.97 $5,183.28 <br />-Water Truck Time Wafer Tanker, 2, 500 Gal. NA NA 24.00 HR $44.09 $1,058.10 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />PermiUjob # : C-1996-083 <br />Abbreviation :none <br />Filename : C083-ZOf <br />JOB COST Total Cost <br />